Johan Castberg-Equinor

Prefabrication with testing and anti-corrosion for the construction of a Norwegian processing and production ship (FPSO).
Client
Johan Castberg-Equinor
Tones
212
Realization period

Prefabrication with testing and anti-corrosion for the construction of a Norwegian processing and production ship (FPSO).
Client
Johan Castberg-Equinor
Tones
212
Realization period